Purchasing & Suppliers
Order what you need. Not what you think you need.
Use your current stock, Par Levels and purchasing setup to work out what needs ordering, then turn those requirements into Orders without rebuilding the numbers somewhere else.
Bar - Week 46: #10
Count detailsStarted: 09/11/2026 | Created by: Sam Mitchell | Last updated: Sam Mitchell | Period: 09/11/2026 04:00 to 16/11/2026 04:00
Count notes
No notes recorded for this count.
| Name | Qty | Unit | Line total (ex VAT) | |
|---|---|---|---|---|
| Aperol4321 | 5 | Each | £74.50 | |
| Bacardi | 2 | Each | £44.00 | |
| Add product | ||||
| Order total (ex VAT) | £118.50 | |||
Ordering shouldn't be guesswork.
Once a stock count is finished, someone still has to decide what needs buying.
That normally means checking:
- What stock is already there.
- What has already been ordered.
- Whether any Events are coming up that require it.
- What each Product's Par Level should be.
- What size or format it is purchased in.
- Which Supplier sells it.
- Whether any Batch Prep means you need more.
- Whether another case is actually needed or not.
Tally brings those pieces together, so the Order starts with what the business actually needs.
From count to order.
Step 1: Calculate
Tally works out the remaining stock requirement using Current Stock, Par Levels, existing Orders and any additional requirements.
192 − 114 + 24 = 102 bottlesStep 2: Convert
Each Product requirement is converted into the Purchase Unit used by its Primary Purchase Rule.
Case (24)4.25 casesStep 3: Review
Check the proposed quantities, make any changes and choose an alternative pre-configured Purchase Rule where required.
Order Trigger 0.3 · 4 cases, not 5Step 4: Order
Tally groups the approved requirements into the correct Orders ready to place.
HaldenGreenleaf ProduceNorthside Drinks
Let Tally work out what you need.
Once Tally knows what you've got and what you want to hold, it calculates what actually needs ordering.
Your current stock, par levels, existing orders and additional requirements all contribute to the calculation.
What did we order last week?
What do we need?
Fever-Tree Tonic 200ml · Why 4 cases?
- Par Level
- 192 bottles
- Current stock
- − 114 bottles
- Already on order
- − 0 bottles
- Summer Party (Sat 21 Nov)
- + 24 bottles
- Requirement
- 102 bottles
- In Case (24), the Primary Purchase Rule
- 4.25 cases
- 0.25 of a case is below your Order Trigger (0.3), so it isn't rounded up.
- Order 4 cases
Order once, order everything.
Normal stock requirements aren't always the only reason you need to buy something. Tally can combine requirements from Events and Batch Prep with your regular stock needs before creating the supplier order.
LIME JUICE
| Stock requirements | 2L |
| Event requirement | 3L |
| Batch Prep | 1L |
| Total requirement | 6L |
Draft order · Greenleaf Produce
Draft- Stock requirements · Par Level top-up2
- Event requirement · Summer Party · 200 Margaritas3
- Batch Prep · Sour mix1
What Greenleaf Produce sees
Lime juice 1L × 6
Avocados (box) × 2
One line per product. The breakdown stays in Tally.
Your suppliers. Your rules.
Different venues and departments don't always buy the same products in the same way. Set up your preferred suppliers and purchasing formats for each part of your business, with alternatives available when you need them.
Purchasing
Par Level
24WAC (per count unit, ex VAT)
£28.2000
| Supplier | Purchase Unit | Purchase Unit Quantity | Purchase Price (ex VAT) | Supplier Product Code | Primary | |
|---|---|---|---|---|---|---|
| Halden | Case | 6 ×1 | 168.00 | HAL-GG70 | Remove | |
| Northside Drinks | Bottle | 1 ×1 | 29.50 | NSD-1182 | Remove |
Your normal purchasing rules remain in place, even when you choose a different supplier or format for an individual order.
From order to delivery.
Once your order is placed, Tally keeps a record of what was ordered and passes that information into the delivery process. When the stock arrives, check it against the original order and record any differences without changing what was originally placed.
| ID | Supplier | Source | Items | Value (ex VAT) | Status | Placed |
|---|---|---|---|---|---|---|
| #51 | Northside Drinksorders@northsidedrinks.co.uk | Stock count #10 | 2 | £135.60 | Draft | - |
| #50 | Haldenorders@haldendrinks.co.uk | Stock count #10 | 2 | £118.50 | Draft | - |
| #49 | Haldenorders@haldendrinks.co.uk | Manual: Weekend top-up | 4 | £395.52 | Awaiting Delivery | 17 Nov 2026 |
| #48 | Haldenorders@haldendrinks.co.uk | Stock count #9 | 3 | £264.00 | Completed | 09 Nov 2026 |
| #47 | Greenleaf Produceorders@greenleafproduce.co.uk | Stock count #9 | 4 | £59.40 | Completed | 09 Nov 2026 |
| #46 | Northside Drinksorders@northsidedrinks.co.uk | Stock count #8 | 3 | £170.00 | Completed | 02 Nov 2026 |
Live Logging
Halden · The Ropewalk
To check
Accepted
Connected to Tally
Every part of Tally uses the same information, so nothing gets typed in twice.
Purchasing & Suppliers
Order what you need. Nothing more.
We'll walk you through the parts of Tally that matter to your business.